Well on Wednesday as promised Parker's crew left, after getting the outside finished as well as,
Getting both of the overhead doors installed,
and most of the sheetrock up, someone still has to come down and "Tape and Plaster" the Fire walls.
Also they did not have the latches or emergency stops for the overhead doors, so they have to come back to finish that.
Next we have to decide how we will finish the south wall, I'll ask the inspector tomorrow if we can use sheetmetal.
Meanwhile Rosie was trying to sneak up on me in the loft.
Again we still need to cover this wall.
In this view from the Loft you can see how they had to wrap the post and rafters with sheetrock.
We also had to leave the plumbing exposed for the inspector, who came by today and had only one minor change for Dave.
So we could put in the rest on the insulation and in a couple of days Buster from Parker Building will be back to seal things up.