Sunday, October 05, 2008

A Lot Got Done

This week they really got a lot done on our building
including the framing of the south wall, but they got tired of waiting for the inspector so they packed-up and went home,
of course 15 minutes after they left the inspector showed up and signed off on the framing.
They did move all the sheetrock inside before they left and,
set the doors and windows in the first floor.
In the afternoon the electrician showed up and we did the framing for the main panel on the south wall,
























But also for the sub-panel on the north wall.

No comments: