Sunday, November 16, 2008

Slow Going

Well we're down to putting the sheetrock in my side, then we can call for the Final Inspection.
We had Mell come and do the Alarm system and he also put a Keypad door handle on one of the Man Doors.

Also in an attempt to recover our parking lot we moved our trailer, it was quite the move, beside trimming part of the roof off the pink building, we had to remove the awning from the trailer.
Even doing all the measuring and cutting the roof off and removing the awning, we still started to touch the pink building and the electric conduit of the new building and it then occurred to me that our problem was the slope of the land so we pulled forward a little and placed lumber under the tires of the trailer to level it and then was able to back it in.
Monday I will call and have the carport removed, and see what Parker building will do about our leaking doors and windows.

No comments: