Yesterday afternoon We called Parker and told them to "come on down" and sign papers, then we heard from Radiant Pro by Fax ($6,000.00) and their bid looked good as well, so things are beginning to gather momentum.
Today I was going to stay home and play with the F-100, BUT PUD showed up so off to Rosie's, Troy (from PUD) said that they could pull the pole and we could run service to a METER pedestal then to NEW building then inside the New building to the East Wall, then from the NEW building to the Existing Building underground and only use the one Meter. So now I need to call Ben and let him know about that plan. 
We also heard from Greg's Concrete and his bid was $7,500.00 (plus only the cost of the wire mesh for the heating pipes) which is material and labor for a 6" 3,000 psi slab with "zip strips" between the poles.
Talked with Atlantis Plumbing and he does not do new construction but he said try Buttons in Toledo.
And I was able to get the mirrors installed on the F-100 now if I could just get a Transmission.