I then talked with Mark at the water Co and he said that there would be no problem building where we wanted to build.
Friday, April 04, 2008
Daily Journal
Well here is the latest on the on going saga of our lives, Today April 4, 2008 first thing this morning I met with Ben MacQuaid with Roberts Electric about service to the new building an he recommended a 200 amp service on the west side of the building with a breaker panel behind it and a 100 amp sub panel in the east end for my shop requirements (which could later be disconnected or remove if converted to storage). He then said that I needed to talk to the Power Co about moving the Pole, so I called Central Lincoln PUD and talked to Laura, Started the process and said that I should here from an engineer by no later than Tuesday and it would probably be Troy, so I should have the pole and meter numbers ready for when he calls (pole# A28C/57 meter# 93706337-53515).